Video quick synopsis:
Almost every wall has been framed, and the roof rafters will be next.

Video detailed description:
Almost every wall has been framed, and the roof rafters will be next. Spaces are taking shape and light is entering through windows (and open studs, for now). The plumbing crew is working its way up with the drains and vents.

left arrow Last:
More framing up to the second floor, new connection to sewer complete.
  Next:
Framing has continued, but in the meantime there was a fire followed by rainfall.
arrow right